Project Name
FY02 MCON Project P-701 Construct Sewer Force Main, Shipyard to WWTP

Client/Owner
Dept of the Navy NAVFACENGCOM PACDIV, Navy Public Works Center, Pearl Harbor, Hawaii

Project Description
The project included installation of approximately 8,350f of 32h diameter HDPE sewer force main pipe and relining of approximately 8,350f of existing 27h force main with 20h diameter HDPE liner pipe. By constructing the new force main, flow in the existing aged and deteriorated 27h force main was relieved to permit the pipeline to be relined, allowing preventive maintenance to be performed alternately on either force main on a periodic basis. The new force main was installed using HDD method to minimize disruption to roadways and the Aloha Aina Park that runs along the south edge of Hickam AFB.